Contact us for a custom quote!

Contact us for a custom quote!

My cart (0)

Your shopping cart is empty!

Continue shopping

Hybrid Resin in 100# (3" puck)

$237.00
Hybrid Resin in 100# (3" puck): $237.00
Hybrid Resin in 100# (3" puck)

Fast-cutting performance meets long-lasting durability.

Unicorn Diamond Co Hybrid Resin Pads are designed to bridge the gap between metal and resin polishing. Engineered with a reinforced resin bond and high-quality industrial diamonds, these pads aggressively remove scratches while leaving a consistent surface ready for resin polishing.

Ideal for early to mid-polishing stages, our hybrid resins reduce the number of steps required and help contractors move through jobs faster without sacrificing finish quality.

Pack Size: Set of 3

Key Features

  • Aggressive scratch removal with controlled refinement
  • Durable hybrid resin bond for extended pad life
  • Consistent scratch pattern for smoother transitions
  • Works on hard, medium, and soft concrete
  • Designed for planetary and single-head machines

Ideal For

  • Transitional polishing stages
  • Removing metal bond scratches
  • Increasing production speed on large jobs

Unicorn diamond co.

When You Find the Unicorn, You Don't Keep Looking.

Premium Diamond Tooling Starts Here.

Shipping info

Australia Post Delivery

In-stock items are generally dispatched within 3 business days of receiving your order. Once your order has been dispatched, you will receive tracking information so you can follow the progress of your delivery.

Please note that delivery times may vary depending on your location and Australia Post's delivery network. Delays may occur during busy periods, public holidays, or due to circumstances outside our control.

Out-of-Stock Items & Lead Times

Some products may be temporarily out of stock and require additional time before they can be dispatched. If an item is listed as out of stock, or you require a larger quantity than is currently available, please contact us before placing your order to confirm availability and the estimated lead time.

What about these?